Bench Burn-In: How Long We Test Before Signing Off

Four hours at rated power is our minimum; here is what we log each hour.

Bench Burn-In: How Long We Test Before Signing Off

Clients shipping units to our Yeonsu bench often ask why we cannot turn reports around same-day. Thermal mass in heat sinks lies. A rig that looks fine at minute thirty may throttle at hour three once adjacent components warm each other.

Hour-by-hour log

  • Hour 0 — Intake photo, ambient temp, pool connection verified
  • Hour 1 — Hash sample every fifteen minutes, fan RPM noted
  • Hour 2 — Infrared scan of board edges and PSU exhaust
  • Hour 3 — Introduce controlled dust at low concentration if client requested dust baseline
  • Hour 4 — Final hash average compared to manufacturer tolerance band

When we extend testing

Suspected failing fan bearing, smell of hot adhesive, or hash variance above 3% triggers an extra two-hour block at no added bench fee. We call before extending.

Shipping tips

Use double-boxing with foam corners. Include a note with pool URL for testing only—we never change payout addresses. Bench review details.